Navy OKs $1 billion for missile called flawed by tester

WASHINGTON – The U.S. Navy approved an Alliant Techsystems Inc. anti-radar missile for full production valued at as much as $1.1 billion, even though the Pentagon’s chief tester says the weapon’s performance flaws “largely negate” its “ability to accomplish its mission.”

While the missile “has the potential to eventually provide some improved combat capability against enemy air defenses, the weapon as tested has multiple deficiencies,” said Michael Gilmore, the Pentagon’s director of operational testing.

Gilmore’s position that earlier problems with the Advanced Anti-Radiation Guided Missile haven’t been remedied wasn’t known publicly when the Navy on Aug. 20 approved full-rate production, the most profitable phase for a defense contractor. Arlington, Va.-based Alliant Techsystems may see sales to the Navy and the Italian Air Force of almost 2,000 missiles through 2020.

The criticism raises the question of whether ineffective missiles may be deployed to the Navy’s Boeing F/A-18 model aircraft and Italian jets, requiring costly improvement upgrades later. The missiles could be used to attack ground radar used by adversaries fielding sophisticated integrated air defenses, such as those of Syria, China and Iran.

The Navy said 600 hours of testing, including 12 live firings, showed the missile was ready for deployment.

Sean Stackley, the Navy’s assistant secretary for research and acquisition, “made the call based on what the tests demonstrated and the fact that this weapon is a significant improvement on what’s in the field,” said Capt. Cate Mueller, a Navy spokeswoman.

Fixes for the issues that led to Gilmore’s assessment are already in the works, with upgrades scheduled for delivery in 2015, Mueller said.

The Advanced Anti-Radiation Guided Missile was designed as an improvement on the HARM missile made by Raytheon Co. The Alliant Techsystems missile is equipped with a more modern homing receiver and navigation system to detect the radar signals of stationary and mobile air-defense systems.

The Navy has budgeted as much as $770 million through 2017 for the missile, with the remaining dollars after 2018.

Testing was halted in 2010 after six software and circuit-card failures in the first 12 trials. A new round of combat testing with upgraded missiles was completed this year.

While the missile’s performance “has improved relative to that experience,” it “is not operationally effective,” Gilmore said. Details of its remaining deficiencies are classified, he said.

Gilmore said he presented his conclusions to the Navy, and its subsequent decision “is up to the discretion of the service.”

The test office was established by Congress in 1984 to provide independent oversight of military service testing of weapons systems. Its director is the defense secretary’s principal adviser on weapons evaluation issues.

Philip Coyle, who headed the testing office from October 1994 through January 2001, said “it would be astonishing” for the Navy to go ahead with production over Gilmore’s objections.

How would a Navy official “justify going into full-rate production on something that was not operationally effective?” said Coyle, who serves as a consultant after working in the White House Office of Science and Technology Policy. “I would think it would be a career-limiting decision” to “spend the taxpayer’s money on something that didn’t work.”

The Navy’s Fleet Forces Command, Marine Corps and Chief of Naval Operations support immediate deployment, Mueller wrote.

Alliant Techsystems spokesman Steve Cortese said the company fully supports the Navy’s decision and it stands behind the missile’s “readiness for operational use and full-rate production.”

Specific testing concerns “have either been remedied or are being addressed as part of a planned block software upgrade we are currently under contract to deliver,” Cortese said.

The missile is produced at the company’s facilities in Woodland Hills and Ridgecrest, Calif.

The company stands by past projections of $1.1 billion in revenue over a decade from full production, Cortese said, Revenue from the missile may increase to $100 million annually from $30 million in the current development phase, the company said on a March 13 conference call with analysts.

The Pentagon test office doesn’t have an official role in deciding whether a weapon proceeds to full production. It can block a weapon from moving to that stage by disapproving of its combat testing plan.

In the case of the Alliant Techsystems missile, Gilmore had approved the test plan and subsequently rendered an assessment required by law for any major production decision as to whether the weapon was “operationally effective” and reliable.

The test office also provides input to the Pentagon’s Defense Acquisition Board when a weapon is under review to move forward in development or production. The office publishes an annual report and interim assessments for congressional staff that could use the information to mandate a program delay or prompt a hearing.

Ben Freeman, a military analyst with the Project on Government Oversight in Washington said, “It might make sense to push ahead with full production even though testing results weren’t stellar if our military desperately needed to field an improved anti-radar missile — but they don’t.”

“There’s no area where this weapon will be immediately put to use,” Freeman said. “So it makes little sense to go into full production of a weapon” the test office “says is not operationally effective.

“The numerous performance shortfalls” will cost “far more to fix after the missiles have been manufactured. In this fiscal environment I hoped the Pentagon was becoming more cost-conscious, but this decision suggests otherwise,” Freeman said.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

A firefighter stands in silence before a panel bearing the names of L. John Regelbrugge and Kris Regelbrugge during the ten-year remembrance of the Oso landslide on Friday, March 22, 2024, at the Oso Landslide Memorial in Oso, Washington. (Ryan Berry / The Herald)
‘Flood of emotions’ as Oso Landslide Memorial opens on 10th anniversary

Friends, family and first responders held a moment of silence at 10:37 a.m. at the new 2-acre memorial off Highway 530.

Julie Petersen poses for a photo with images of her sister Christina Jefferds and Jefferds’ grand daughter Sanoah Violet Huestis next to a memorial for Sanoah at her home on March 20, 2024 in Arlington, Washington. Peterson wears her sister’s favorite color and one of her bangles. (Annie Barker / The Herald)
‘It just all came down’: An oral history of the Oso mudslide

Ten years later, The Daily Herald spoke with dozens of people — first responders, family, survivors — touched by the deadliest slide in U.S. history.

Victims of the Oso mudslide on March 22, 2014. (Courtesy photos)
Remembering the 43 lives lost in the Oso mudslide

The slide wiped out a neighborhood along Highway 530 in 2014. “Even though you feel like you’re alone in your grief, you’re really not.”

Director Lucia Schmit, right, and Deputy Director Dara Salmon inside the Snohomish County Department of Emergency Management on Friday, March 8, 2024, in Everett, Washington. (Ryan Berry / The Herald)
How Oso slide changed local emergency response ‘on virtually every level’

“In a decade, we have just really, really advanced,” through hard-earned lessons applied to the pandemic, floods and opioids.

Ron and Gail Thompson at their home on Monday, March 4, 2024 in Oso, Washington. (Olivia Vanni / The Herald)
In shadow of scarred Oso hillside, mudslide’s wounds still feel fresh

Locals reflected on living with grief and finding meaning in the wake of a catastrophe “nothing like you can ever imagine” in 2014.

Everett mall renderings from Brixton Capital. (Photo provided by the City of Everett)
Topgolf at the Everett Mall? Mayor’s hint still unconfirmed

After Cassie Franklin’s annual address, rumors circled about what “top” entertainment tenant could be landing at Everett Mall.

Everett
Everett man sentenced to 3 years of probation for mutilating animals

In 2022, neighbors reported Blayne Perez, 35, was shooting and torturing wildlife in north Everett.

The Washington State University Snohomish County Extension building at McCollum Park is located in an area Snohomish County is considering for the location of the Farm and Food Center on Thursday, March 28, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Year-round indoor farmers market inches closer to reality near Mill Creek

The Snohomish County Farm and Food Center received $5 million in federal funding. The county hopes to begin building in 2026.

Dorothy Crossman rides up on her bike to turn in her ballot  on Tuesday, Aug. 1, 2023 in Everett, Washington. (Olivia Vanni / The Herald)
Everett leaders plan to ask voters for property tax increase

City officials will spend weeks hammering out details of a ballot measure, as Everett faces a $12.6 million deficit.

Starbucks employee Zach Gabelein outside of the Mill Creek location where he works on Friday, Feb. 23, 2024 in Mill Creek, Washington. (Olivia Vanni / The Herald)
Mill Creek Starbucks votes 21-1 to form union

“We obviously are kind of on the high of that win,” store bargaining delegate Zach Gabelein said.

Lynnwood police respond to a collision on highway 99 at 176 street SW. (Photo provided by Lynnwood Police)
Police: Teen in stolen car flees cops, causes crash in Lynnwood

The crash blocked traffic for over an hour at 176th Street SW. The boy, 16, was arrested on felony warrants.

The view of Mountain Loop Mine out the window of a second floor classroom at Fairmount Elementary on Wednesday, Jan. 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
County: Everett mining yard violated order to halt work next to school

At least 10 reports accused OMA Construction of violating a stop-work order next to Fairmount Elementary. A judge will hear the case.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.