Like The Herald Business Journal on Facebook!
The Herald of Everett, Washington
Heraldnet.com

The top local business stories in your email

Contact Us:

Josh O'Connor
Publisher
Phone: 425-339-3007
joconnor@heraldnet.com

Jody Knoblich
General Sales Manager
Phone: 425-339-3445
Fax: 425-339-3049
jknoblich@heraldnet.com

Jim Davis
Editor
Phone: 425-339-3097
jdavis@heraldnet.com

Site address:
1800 41st Street, S-300,
Everett, WA 98203

Mailing address:
P.O. Box 930
Everett, WA 98206

HBJ RSS feeds

Japan probe uncovers improper 787 battery wiring

SHARE: facebook Twitter icon Pinterest icon Linkedin icon Google+ icon Email icon |  PRINTER-FRIENDLY  |  COMMENTS
Associated Press
Published:
  • This  photo provided by the Japan Transport Safety Board shows the damaged main lithium-ion battery, left, and an undamaged auxiliary battery of the A...

    Japan Transport Safety Board via Associated Press

    This photo provided by the Japan Transport Safety Board shows the damaged main lithium-ion battery, left, and an undamaged auxiliary battery of the All Nippon Airways Boeing 787 which made an emergency landing on Jan. 16 in Takamatsu, Japan.

TOKYO — A probe into the overheating of a lithium ion battery in an All Nippon Airways Boeing 787 that made an emergency landing found it was improperly wired, Japan's Transport Ministry said Wednesday.
The Transport Safety Board said in a report that the battery for the aircraft's auxiliary power unit was incorrectly connected to the main battery that overheated, although a protective valve would have prevented power from the auxiliary unit from causing damage.
Flickering of the plane's tail and wing lights after it landed and the fact the main battery was switched off led the investigators to conclude there was an abnormal current traveling from the auxiliary power unit due to miswiring.
The agency said more analysis was needed to determine what caused the main battery to overheat and emit the smoke that prompted the Jan. 16 emergency landing of the ANA domestic flight and the worldwide grounding of Boeing 787 jets. They said they are consulting Boeing about the issue.
The Federal Aviation Administration and aviation authorities in other countries grounded 787 fleets because of the ANA incident, which followed a battery fire earlier in January in a 787 parked in Boston.
The 787, dubbed the Dreamliner by Boeing, is the first airliner to make extensive use of lithium ion batteries, which are lighter in weight, charge faster and contain more energy than conventional batteries similar in size. However, the batteries also are more prone to overheating and catching fire.
LOT Polish Airlines is losing $50,000 a day due to the grounding of its two 787s, according to government information made public on Wednesday.
LOT, a deeply indebted state-run airline, was the first European one to get the Dreamliners. Deputy Treasury Minister Rafal Baniak put total losses due to the grounded planes Wednesday at $2.5 million. The airline also is awaiting six more 787s to be delivered.
Boeing has not said how much the 787 grounding will cost it.
Imperial Capital analyst Ken Herbert estimated last week that it could cost Boeing $25 million per month in direct costs, with the total price tag climbing past $1 billion, including spending to fix the problem and expenses for delayed deliveries.
Story tags » 787Aerospace

MORE HBJ HEADLINES

CALENDAR

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus

Market roundup