The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions
Dan Catchpole | dcatchpole@heraldnet.com
Published: Monday, July 29, 2013, 10:01 a.m.

Boeing 787-9 leaves paint hangar with new livery

  • The first Boeing 787-9 is rolled out of the paint hangar at Paine Field last week.

    Boeing

    The first Boeing 787-9 is rolled out of the paint hangar at Paine Field last week.

  • The first Boeing 787-9 in the paint hangar at Paine Field.

    Boeing

    The first Boeing 787-9 in the paint hangar at Paine Field.

The Boeing Co. has painted the first 787-9 in a new company livery, though it's not a radical departure from the old one. The new plane was rolled out of the paint hangar at Paine Field last week. The company plans to fly the plane later this summer and deliver the first 787-9 in the middle of next year. Here's the news release:

EVERETT, Wash., July 27, 2013 /PRNewswire/ -- Boeing [NYSE: BA] continues to make progress on the first 787-9 Dreamliner, which also has become the first 787 to don the new Boeing Commercial Airplanes livery. The airplane has just rolled out of the paint hangar.

This refreshed look for the Boeing family began with the 747-8 and evolved with the 737 MAX. The new livery retains many of the features of the original 787-8 livery, adding a prominent number on the tail to help distinguish among models within the same product family.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers), with 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to roll out and fly the 787-9, currently in final production, in late summer. First delivery to launch customer Air New Zealand is set for mid-2014.

Story tags » 787

Sign up for HeraldNet headlines Newsletter
See sample | Privacy policy

Most recent Aerospace blog posts

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

» More business


HeraldNet highlights

A quest to high places
A quest to high places: Everett man hopes his journey will help save fire lookouts
43 lives. 43 trees
43 lives. 43 trees: Ceremony unlocks Oso stretch of Highway 530
Faith in her voice
Faith in her voice: Stanwood singer's voice, spark earn her notice
Chris Pratt's star rises
Chris Pratt's star rises: Lake Stevens roots keep him grounded as he hosts 'SNL'