The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions

Calendar


HeraldNet Headlines
HeraldNet Newsletter Delivered to your inbox each week.
Published: Wednesday, January 22, 2014, 12:18 p.m.

3-foot chunk stuck in Seattle tunnel machine

SEATTLE — Crews have found a hard object more than 3 feet wide lodged in the tunneling machine that’s currently stalled 60 feet under the city of Seattle, officials said Wednesday.
The large object is either a boulder or piece of concrete that got stuck within the massive spokes of the machine called Bertha, said state Department of Transportation spokeswoman Laura Newborn. Crews have also found metal and plastic piping in the machine but have not concluded what exactly has been causing problems for the machine.
“None of these things in and of themselves is enough to slow the machine down,” Newborn said.
Tunneling has been halted since early December, an early setback in a $3.1 billion project to replace the Alaskan Way Viaduct along the downtown Seattle waterfront.
Newborn said hyperbaric investigations are continuing in the machine. The hyperbaric work involves pumping air into the chamber in order to stabilize the ground in front of the tunneling machine, allowing crews to work safely in that area.
Crews temporarily lost air pressure in the chamber in recent days and spent Sunday re-establishing pressure so the inspection work could continue. The results of the inspection will be reviewed by a tunneling operation task force convened by the state.
Bertha is designed to easily handle rocks under 3 feet in size because the machine is large enough to simply consume those chunks. Larger boulders could be crushed by the front of the machine as it moves forward, but workers also have the option of breaking apart problematic rocks.
Meanwhile, officials have previously said the machine ran into an 8-inch diameter metal pipe that had been left in the ground in 2002 after the state transportation department checked groundwater in the area.
Bertha is stopped about 60 feet underground and one-tenth of the way toward completing a 1.7-mile tunnel. It will carry Highway 99 traffic and allow the removal of the Alaskan Way Viaduct.
———
Follow AP Writer Mike Baker on Twitter: https://twitter.com/MikeBakerAP

Related

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

HeraldNet highlights

An easy fishing fix
An easy fishing fix: I-90 offers quick access to gorgeous fish, novice-friendly streams
Capturing the past
Capturing the past: Photos bring 19th-century Snohomish architect's work to light
Cherished chair returned
Cherished chair returned: Woman reunited with memento of her husband stolen in 2010
'Fury' is brutal
'Fury' is brutal: Film makes sure the audience knows war is hell
SnoCoSocial