Federal report backs Keystone pipeline

WASHINGTON — The State Department concluded in its final environmental assessment issued Friday that the proposed Keystone XL pipeline would be unlikely to alter global greenhouse gas emissions, but officials cautioned that they were still weighing whether or not the project would meet the test of President Barack Obama’s broader climate strategy.

Though the report acknowledged that tapping the Canadian oil sands for the pipeline would produce more greenhouse gases, the assessment also said that blocking the project would not prevent development of those resources.

The report “is not a decision document,” said Kerri-Ann Jones, assistant secretary of state for oceans and international environmental and scientific affairs. “This document is only one factor that will be coming into the review process for this permit” sought by TransCanada, an energy giant based in Calgary, Alberta.

The $5.4 billion pipeline, which would transport heavy crude from Canadian oil sands in Alberta into the heart of the U.S. pipeline network, has become the focus of intense controversy. Foes say it will contribute to climate change; supporters say it will secure U.S. oil supplies from a friendly neighbor and create U.S. construction jobs.

The release of the long-awaited Final Environmental Impact Statement is certain to trigger an avalanche of lobbying aimed at Secretary of State John Kerry, who has made climate change a central focus of his career and will now begin preparing a decision.

Obama said in June that he would sign off on the proposal only if it “does not significantly exacerbate the climate problem.”

The decision remains politically fraught for Democrats. Environmental activists fiercely oppose it, arguing the pipeline could leak, would accelerate development of the greenhouse gas-intensive oil sands in Alberta and would increase America’s dependence on fossil fuels.

Wendy Abrams, founder of the Chicago-based nonprofit group Cool Globes and a major Democratic campaign contributor, said she felt a “gut-wrenching pain for my kids” when she read the report. She said it made her question her past support for Obama and Kerry. “If they can’t get it done, what am I hoping for?”

The State Department’s report includes 11 volumes of analysis on how the proposed pipeline would affect heavy-crude extraction in Canada’s oil sands and reaches the same conclusion as its draft report did in March: No single infrastructure project will alter the course of oil development in Alberta.

The report said that “the proposed Project is unlikely to significantly affect the rate of extraction in oil sands areas (based on expected oil prices, oil-sands supply costs, transport costs, and supply-demand scenarios).”

Last week, TransCanada began shipping oil through the southern leg of the Keystone pipeline, which runs from Cushing, Okla., to Port Arthur, Texas. But the company is still waiting for a State Department permit for the 1,179-mile northern leg that would carry heavy crude from Canada into Montana and run to the small town of Steele City, Neb.

“We’re very pleased with the release and about being able to move to this next stage of the process,” said Russ Girling, chief executive of TransCanada. “The case for the Keystone XL, in our view, is as strong as ever.”

He said it would take about two years to construct the northern leg, but he cautioned that summer is best for construction and that a long permit process could further delay the project.

Jones, the State Department official, said that the report does not answer the question of how this pipeline decision fits into the “broader national and international efforts to address climate change, or other questions of foreign policy or energy security.”

She added that the study relied on assumptions about pipeline capacity, oil prices and transportation and development costs that were “uncertain and changeable.”

Oil industry officials welcomed the fact that the department had affirmed the idea that the pipeline decision did not have a major climate impact.

“Time and time again, State reaches the same conclusion despite the unprecedented and thorough environmental review,” said Cindy Schild, the American Petroleum Institute’s senior manager for oil sands policy. She said that “it is hard to figure out how they could conclude that it is not in the national interest.”

The report estimated the project would generate about 1,950 annual construction jobs in Montana, South Dakota, Nebraska and Kansas over a two-year period and contribute approximately $3.4 billion to the U.S. gross domestic product. It would generate about 50 jobs once in operation.

In an interview this week, AFL-CIO President Richard Trumka said members of his labor federation back the project. “We think that anything that’s going to create jobs, help the country and do it in an environmentally sound way ought to be done,” he said.

The high-profile decision now enters a new phase, in which Kerry and his deputies will field public comments and internal feedback from eight agencies, including the Environmental Protection Agency and the departments of Defense and Energy. The State Department will open a 30-day comment period on Feb. 5, and the agencies will have 90 days to weigh in. After a decision is issued, other agencies have 15 days to object. If one does, the president must decide whether or not to issue the permit.

“It is hard to imagine how the president could justify rejection without turning the United States into a poster child for what the energy industry terms ‘above-ground’ risk,” said Robert McNally, president of the Rapidan Group consulting firm. “I don’t see how logically the president can reject it if he applies the criteria he laid out at Georgetown last year, i.e. whether or not the pipeline would severely exacerbate climate change.”

The EPA has questioned whether the State Department has given sufficient weight to the project’s negative environmental impact. The final environmental impact statement notes that bitumen, the substance that is extracted in Canada and diluted in order to be transported to U.S. refineries, is more difficult to clean up than lighter crude if it spills.

The report concludes that crude extracted from the oil sands results in 17 percent more greenhouse gas emissions than the average barrel of crude used in the United States but only 2 percent to 10 percent more than the heavy crude it would likely replace at gulf coast refineries.

The report also said that a variety of rail transportation options would result in 28 percent to 42 percent more emissions than the pipeline. State has cited rail as a reason why blocking the pipeline would not slow oil sands development, although a spate of oil train derailments – including a derailment Friday in southeast Mississippi – have highlighted the dangers of that alternative.

When asked Friday whether the president will directly weigh in on the decision, Jay Carney, the White House press secretary, said, “At this point, the process is now at the State Department, and we’re going to let that run its course.”

The administration has some flexibility on timing; the State Department could issue a decision either before the end of the 105-day agency comment period or long afterwards.

“Secretary Kerry is just really beginning his involvement in this process,” Jones said. “There is no timeline for his deliberations.”

Environmental groups are organizing a “Day of Action” on Tuesday during which they plan to flood Kerry’s office with phone calls and emails.

“To some extent, Secretary Kerry has gotten a pass to date,” said Tiernan Sittenfeld, the League of Conservation Voters’ senior vice president for government affairs. “Now that changes. This is a really a pivot point, and this is a real opportunity for him to live up to the climate record he has established through his very accomplished career.”

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Girl, 11, missing from Lynnwood

Sha’niece Watson’s family is concerned for her safety, according to the sheriff’s office. She has ties to Whidbey Island.

A cyclist crosses the road near the proposed site of a new park, left, at the intersection of Holly Drive and 100th Street SW on Thursday, May 2, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Everett to use $2.2M for Holly neighborhood’s first park

The new park is set to double as a stormwater facility at the southeast corner of Holly Drive and 100th Street SW.

The Grand Avenue Park Bridge elevator after someone set off a fire extinguisher in the elevator last week, damaging the cables and brakes. (Photo provided by the City of Everett)
Grand Avenue Park Bridge vandalized, out of service at least a week

Repairs could cost $5,500 after someone set off a fire extinguisher in the elevator on April 27.

Everett
Deputies arrest woman after 2-hour standoff south of Everett

Just before 9 a.m., police responded to reports of domestic violence in the 11600 block of 11th Place W.

Bruiser, photographed here in November 2021, is Whidbey Island’s lone elk. Over the years he has gained quite the following. Fans were concerned for his welfare Wednesday when a rumor circulated social media about his supposed death. A confirmed sighting of him was made Wednesday evening after the false post. (Jay Londo )
Whidbey Island’s elk-in-residence Bruiser not guilty of rumored assault

Recent rumors of the elk’s alleged aggression have been greatly exaggerated, according to state Fish and Wildlife.

Jamel Alexander stands as the jury enters the courtroom for the second time during his trial at the Snohomish County Courthouse on Monday, May 6, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Second trial in Everett woman’s stomping death ends in mistrial

Jamel Alexander’s conviction in the 2019 killing of Shawna Brune was overturned on appeal in 2023. Jurors in a second trial were deadlocked.

A car drives past a speed sign along Casino Road alerting drivers they will be crossing into a school zone next to Horizon Elementary on Thursday, March 7, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
Traffic cameras begin dinging school zone violators in Everett

Following a one-month grace period, traffic cameras are now sending out tickets near Horizon Elementary in Everett.

(Photo provided by Washington State Criminal Justice Training Commission, Federal Way Mirror)
Everett officer alleges sexual harassment at state police academy

In a second lawsuit since October, a former cadet alleges her instructor sexually touched her during instruction.

Michael O'Leary/The Herald
Hundreds of Boeing employees get ready to lead the second 787 for delivery to ANA in a procession to begin the employee delivery ceremony in Everett Monday morning.

photo shot Monday September 26, 2011
Boeing faces FAA probe of Dreamliner inspections, records

The probe intensifies scrutiny of the planemaker’s top-selling widebody jet after an Everett whistleblower alleged other issues.

A truck dumps sheet rock onto the floor at Airport Road Recycling & Transfer Station on Thursday, Nov. 30, 2023 in Everett, Washington. (Olivia Vanni / The Herald)
Mountlake Terrace transfer station closed for most of May

Public Works asked customers to use other county facilities, while staff repaired floors at the southwest station.

Traffic moves along Highway 526 in front of Boeing’s Everett Production Facility on Nov. 28, 2022, in Everett, Washington. (Olivia Vanni / Sound Publishing)
Frank Shrontz, former CEO and chairman of Boeing, dies at 92

Shrontz, who died Friday, was also a member of the ownership group that took over the Seattle Mariners in 1992.

(Kate Erickson / The Herald)
A piece of gum helped solve a 1984 Everett cold case, charges say

Prosecutors charged Mitchell Gaff with aggravated murder Friday. The case went cold after leads went nowhere for four decades.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.