The Herald of Everett, Washington
HeraldNet on Facebook HeraldNet on Twitter HeraldNet RSS feeds HeraldNet Pinterest HeraldNet Google Plus HeraldNet Youtube
HeraldNet Newsletters  Newsletters: Sign up | Manage  Green editions icon Green editions

Calendar


HeraldNet Headlines
HeraldNet Newsletter Delivered to your inbox each week.
Published: Monday, March 10, 2014, 1:00 a.m.
In Our View/Bakken Crude Oil Shipments


As railroads replace pipelines

Life felt simpler when North Dakota was known primarily for ice fishing, Lawrence Welk and the Norsk Hostfest in Minot. Today, crude oil beneath the Bakken formation in western North Dakota has rejuvenated the state’s economy and driven down unemployment to the lowest in the country at 3.1 percent.
The trouble with Bakken crude (disregard its carbon footprint and the mess of hydraulic fracking for now) is that it’s highly flammable. The 2013 derailment of an oil train in Quebec and attendant inferno that killed 47 people brought into focus the perils of rail transport, particularly with older “DOT-111” tank cars. These aging carriers — around 80,000 are in use — are more likely to puncture than newer tank cars with sturdier hulls.
Bakken crude is an everyday feature of the Northwest landscape. Washington is the fifth-largest refining state in the U.S.
Shipments of Bakken crude into the Pacific Northwest began with zero fanfare two years ago, the Sightline Institute’s Eric de Place writes in an institute report, “The Northwest’s Pipeline By Rails.”
”So sudden was the region’s oil boom that companies found themselves with scant infrastructure,” de Place writes. “Railways seized the opportunity to play a role traditionally reserved for pipelines: moving large volumes of crude oil. The rail industry embarked on a breakneck campaign of building tanker cars as refineries and ports began hatching plans to receive the product from trains.”
Last week, at a hearing on rail safety before a Senate subcommittee, Sen. Maria Cantwell, D-Wash, pushed for better federal oversight. The rail-industry’s non-compulsory safety agreement throws the question into relief.
“When you have a voluntary system, not everybody complies with it; what do you do about that?” Cantwell asked.
Sixty percent of aging tank cars will be phased out by the end of 2015, industry representatives said. Is that fast enough, while Bakken crude DOT-111 cars rumble through major population centers, from Spokane to Seattle?
“We’ve gone from four years ago — having basically nothing on rail by crude — to now having something like 408,000 carloads of crude,” Cantwell said. “Knowing when those DOT-111 cars are going to be off those rails — these cars that the National Transportation Safety Board has already said are unacceptable — this is a key issue for me and for my state.”
Standards to improve the DOT-111 cars are more than a year behind schedule, according to regulators. That needs to be stepped up, and teeth added to federal measures to hold the rail industry accountable. No excuses, no delays.

Share your comments: Log in using your HeraldNet account or your Facebook, Twitter or Disqus profile. Comments that violate the rules are subject to removal. Please see our terms of use. Please note that you must verify your email address for your comments to appear.

You are logged in using your HeraldNet ID. Click here to update your profile. | Log out.

Our new comment system is not supported in IE 7. Please upgrade your browser here.

comments powered by Disqus
digital subscription promo

Subscribe now

Unlimited digital access starting at 99 cents, or included with any print subscription.

loading...

Herald Editorial Board

Jon Bauer, Opinion Editor: jbauer@heraldnet.com

Carol MacPherson, Editorial Writer: cmacpherson@heraldnet.com

Neal Pattison, Executive Editor: npattison@heraldnet.com

Josh O'Connor, Publisher: joconnor@heraldnet.com

Have your say

Feel strongly about something? Share it with the community by writing a letter to the editor. Send letters by e-mail to letters@heraldnet.com, by fax to 425-339-3458 or mail to The Herald - Letters, P.O. Box 930, Everett, WA 98206. Include your name, address and daytime phone number. (We'll only publish your name and hometown.) We reserve the right to edit letters, but if you keep yours to 250 words or less, we won’t ask you to shorten it. If your letter is published, please wait 30 days before submitting another. Have a question about letters? Contact Carol MacPherson at cmacpherson@heraldnet.com or 425-339-3472.