Lakewood High to be completely overhauled

LAKEWOOD — Lakewood High School students are expected to be in a new building by fall 2017.

A complete overhaul of the current high school is scheduled in phases during the next three years, shifting classes to portables while the school is torn down and rebuilt one half at a time.

The project is funded by a $66.8 million bond. The bond measure passed in April with 1,995 yes votes and 1,325 no votes. It had failed in November by about 30 votes.

The Lakewood School District decided to remodel the 30-year-old high school to prepare for growth, adjust to new technologies and programs, and improve school security, superintendent Michael Mack said. The project design involves tearing down most of the current high school. The existing gymnasium and a few exterior walls are expected to be incorporated into the new building.

The planned two-story, 168,000-square-foot Lakewood High School is designed for 850 students, about 125 more than current enrollment, Mack said.

“We know that there’s going to be growth coming,” he said. “We think that once the new high school is up and running, it will maybe attract some of our students that go elsewhere.”

The district also set aside land next to the school so the building can be expanded in the future.

Plans for the new high school include a greenhouse, auditorium, wrestling and gymnastics room, student store, group work spaces, and updated science labs and workshops for manufacturing, robotics and engineering classes.

The bond dollars are designated for building the high school, and an anticipated $5 million or more in state matching funds is marked for updating athletic facilities. The district hopes to put in a turf field, a new track and a new tennis court, Mack said.

The district estimates a two-year timeline for constructing the high school. Additional work on athletic fields, pathways, parking and roads is scheduled for a third year, wrapping up in fall 2018.

Mack expects to see portables on school property in January. At the end of this school year, about half of the classrooms are going to relocate to portables while one side of the school is torn down. Once the first half of the building is complete, classrooms on the other side of the school can move to the portables while the second half of the building is leveled and rebuilt.

Safety is a priority for the new building, Mack said. The high school has too many exterior access doors that have to be locked by hand. The new building is designed to have fewer entrances and exits, all of which can be locked automatically in case of an emergency.

The designs also bring student parking closer to the school and create cross- campus lit walkways to connect the high school to the middle school, elementary school and district office. The district plans to build a new access road for buses between the high school and middle school to lighten traffic on 172nd Street.

“Because we don’t have a town, this school kind of becomes our community center,” Mack said. “For us, this is really exciting.”

Heavy, noisy stages of construction are scheduled for the summers, he said. The school year is for less disruptive interior work.

Two graduating classes are expected to spend their senior years with the school under construction. Mack hopes to make it a fun distinction for seniors rather than a headache, possibly through themed T-shirts or events.

“It’s not all about the school,” Mack said. “It’s about the spirit.”

Kari Bray: 425-339-3439; kbray@heraldnet.com.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

A firefighter stands in silence before a panel bearing the names of L. John Regelbrugge and Kris Regelbrugge during the ten-year remembrance of the Oso landslide on Friday, March 22, 2024, at the Oso Landslide Memorial in Oso, Washington. (Ryan Berry / The Herald)
‘Flood of emotions’ as Oso Landslide Memorial opens on 10th anniversary

Friends, family and first responders held a moment of silence at 10:37 a.m. at the new 2-acre memorial off Highway 530.

Julie Petersen poses for a photo with images of her sister Christina Jefferds and Jefferds’ grand daughter Sanoah Violet Huestis next to a memorial for Sanoah at her home on March 20, 2024 in Arlington, Washington. Peterson wears her sister’s favorite color and one of her bangles. (Annie Barker / The Herald)
‘It just all came down’: An oral history of the Oso mudslide

Ten years later, The Daily Herald spoke with dozens of people — first responders, family, survivors — touched by the deadliest slide in U.S. history.

Victims of the Oso mudslide on March 22, 2014. (Courtesy photos)
Remembering the 43 lives lost in the Oso mudslide

The slide wiped out a neighborhood along Highway 530 in 2014. “Even though you feel like you’re alone in your grief, you’re really not.”

Director Lucia Schmit, right, and Deputy Director Dara Salmon inside the Snohomish County Department of Emergency Management on Friday, March 8, 2024, in Everett, Washington. (Ryan Berry / The Herald)
How Oso slide changed local emergency response ‘on virtually every level’

“In a decade, we have just really, really advanced,” through hard-earned lessons applied to the pandemic, floods and opioids.

Ron and Gail Thompson at their home on Monday, March 4, 2024 in Oso, Washington. (Olivia Vanni / The Herald)
In shadow of scarred Oso hillside, mudslide’s wounds still feel fresh

Locals reflected on living with grief and finding meaning in the wake of a catastrophe “nothing like you can ever imagine” in 2014.

Everett mall renderings from Brixton Capital. (Photo provided by the City of Everett)
Topgolf at the Everett Mall? Mayor’s hint still unconfirmed

After Cassie Franklin’s annual address, rumors circled about what “top” entertainment tenant could be landing at Everett Mall.

Everett
Everett man sentenced to 3 years of probation for mutilating animals

In 2022, neighbors reported Blayne Perez, 35, was shooting and torturing wildlife in north Everett.

Dorothy Crossman rides up on her bike to turn in her ballot  on Tuesday, Aug. 1, 2023 in Everett, Washington. (Olivia Vanni / The Herald)
Everett leaders plan to ask voters for property tax increase

City officials will spend weeks hammering out details of a ballot measure, as Everett faces a $12.6 million deficit.

Starbucks employee Zach Gabelein outside of the Mill Creek location where he works on Friday, Feb. 23, 2024 in Mill Creek, Washington. (Olivia Vanni / The Herald)
Mill Creek Starbucks votes 21-1 to form union

“We obviously are kind of on the high of that win,” store bargaining delegate Zach Gabelein said.

Lynnwood police respond to a collision on highway 99 at 176 street SW. (Photo provided by Lynnwood Police)
Southbound lanes on Highway 99 reopen after crash

The crash, on Highway 99 at 176th Street SW, blocked traffic for over an hour. Traffic was diverted to 168th Street SW.

The view of Mountain Loop Mine out the window of a second floor classroom at Fairmount Elementary on Wednesday, Jan. 10, 2024 in Everett, Washington. (Olivia Vanni / The Herald)
County: Everett mining yard violated order to halt work next to school

At least 10 reports accused OMA Construction of violating a stop-work order next to Fairmount Elementary. A judge will hear the case.

Imagine Children's Museum's incoming CEO, Elizabeth "Elee" Wood. (Photo provided by Imagine Children's Museum)
Imagine Children’s Museum in Everett to welcome new CEO

Nancy Johnson, who has led Imagine Children’s Museum in Everett for 25 years, will retire in June.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.