Cleanup begins at polluted Everett waterway

EVERETT — The East Waterway is finally getting cleaned up. Just don’t expect it to happen quickly.

The waterway, an inlet off Possession Sound between the Port of Everett and Naval Station Everett, has long borne the brunt of industrial activity along the city’s waterfront.

On June 30, the state Department of Ecology issued an agreement that begins the first stage of a multi-year cleanup process.

The so-called Agreed Order between the Ecology department, the Port of Everett, Kimberly-Clark Worldwide Inc. and the state Department of Natural Resources lays out the order of events that will transpire over the next several years.

The early stages of the process will be focused on identifying what pollutants are present, and at what concentrations, in the sediment of the waterway.

Only after that will the signatories to the agreement figure out who is responsible for what share of the costs of cleanup

“There’s not a lot of information to go on right now,” said Leonard Machut, the Aquatics Unit Supervisor in Ecology’s Toxics Cleanup Program.

The East Waterway has been on the state’s cleanup list since 2007. Some testing of the sediment has revealed elevated levels of metals such as arsenic, mercury, copper, lead and zinc. Other compounds are also present, including polycyclic aromatic hydrocarbons, semivolatile organic compounds, polychlorinated biphenyls (commonly known as PCBs), and dioxins, a group of chemicals believed to cause cancer in humans.

In 2011, sampling in the sediment revealed an average concentration of dioxins of more than 63 parts per trillion. The Ecology department considers anything more than 4 parts per trillion to be potentially unsafe.

Those tests also revealed a layer of wood pulp on the bottom of the waterway, smothering all sea life.

While there has been periodic sampling and testing for toxins over the years, there has never been a comprehensive survey of all the pollutants in the bay.

“Right now we have a couple of data points, but the gaps between them are pretty large,” Machut said.

The source of the pollutants is less of a mystery: lumber mills have operated on that waterfront since at least 1902, and in 1931 the Puget Sound Pulp and Timber Co. built a mill that would later be acquired by Scott Paper Co. and Kimberly-Clark.

Kimberly-Clark operated the mill until 2012, then closed it down and demolished the mill. Cleanup of the former mill site — excluding the waterway — has been entangled in a lawsuit with the city of Everett since last August.

In addition to the mills, the Navy operated its Naval Industrial Reserve Shipyard from 1942-1960 on the land that later became Naval Station Everett, and the Port of Everett has operated several marine terminals.

Raw industrial wastewater and sewage was discharged into the bay until the first deep-water outfall pipe was built in 1951. Treatment of wastewater didn’t begin until 1965.

Bob Brand, a spokesman for Kimberly-Clark, said that because cleanup was still some years away, it wasn’t possible to estimate what share of the costs the company will have to pay.

“It is basically a framework for an investigation of the remediation that will be required to clean up the East Waterway,” Brand said.

“We want to get the investigation done first and identify all the correct steps,” he said.

The agreement also lists the Department of the Navy as a “potentially liable party” alongside Kimberly-Clark, the Port and Natural Resources department, but the Navy is not a signatory to the agreement.

The Navy’s policy is generally to use arrangements other than Agreed Orders to clean up properties, Machut said.

“They will be sitting at the table, they will be a responsible agent,” he said.

The initial stages of the cleanup will focus on developing a work plan for investigation and a feasibility study, which might take up to a year before the actual investigation begins, to say nothing of drawing up a final plan and beginning the cleanup.

Several stages of the process require public notification and comment periods, including the first one. The Department of Ecology is holding a public meeting July 14 on the project and accepting comments through July 30.

Plans for the cleanup are available online at http://1.usa.gov/1COHtrw, at the Everett Public Library, 2720 Hoyt Ave., or at Ecology’s headquarters, 300 Desmond Drive SE, Lacey (contact Carol Dorn at 360-407-7224 or carol.dorn@ecy.wa.gov to make an appointment).

Chris Winters: 425-374-4165; cwinters@heraldnet.com. Twitter: @Chris_At_Herald.

Public meeting and comments

The state Department of Ecology is holding a public open house July 14 on its plans to clean up the East Waterway. The meeting will be held at 6 p.m. in the Mount Baker Room of Everett Station, 3201 Smith Ave., Suite 131, Everett. Public comments can be sent to Andrew Kallus via email to andrew.kallus@ecy.wa.gov or regular mail to Department of Ecology, Toxics Cleanup Program, P.O. Box 47600, Olympia, WA 98504-7600. The comment deadline is July 30.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Girl, 11, missing from Lynnwood

Sha’niece Watson’s family is concerned for her safety, according to the sheriff’s office. She has ties to Whidbey Island.

A cyclist crosses the road near the proposed site of a new park, left, at the intersection of Holly Drive and 100th Street SW on Thursday, May 2, 2024, in Everett, Washington. (Ryan Berry / The Herald)
Everett to use $2.2M for Holly neighborhood’s first park

The new park is set to double as a stormwater facility at the southeast corner of Holly Drive and 100th Street SW.

The Grand Avenue Park Bridge elevator after someone set off a fire extinguisher in the elevator last week, damaging the cables and brakes. (Photo provided by the City of Everett)
Grand Avenue Park Bridge vandalized, out of service at least a week

Repairs could cost $5,500 after someone set off a fire extinguisher in the elevator on April 27.

Biologist Kyle Legare measures a salmon on a PUD smolt trap near Sportsman Park in Sultan, Washington on May 6, 2024. (Annie Barker / The Herald)
Low Chinook runs endanger prime fishing rivers in Snohomish County

Even in pristine salmon habitat like the Sultan, Chinook numbers are down. Warm water and extreme weather are potential factors.

Lynnwood
Car hits pedestrian pushing stroller in Lynnwood, injuring baby, adult

The person was pushing a stroller on 67th Place W, where there are no sidewalks, when a car hit them from behind, police said.

Snohomish County Courthouse. (Herald file)
Everett substitute judge faces discipline for forged ‘joke’ document

David Ruzumna, a judge pro tem, said it was part of a running gag with a parking attendant. The Commission on Judicial Conduct wasn’t laughing.

Boeing firefighters union members and supporters hold an informational picket at Airport Road and Kasch Park Road on Monday, April 29, 2024 in Everett, Washington. (Annie Barker / The Herald)
Biden weighs in on Boeing lockout of firefighters in Everett, elsewhere

On Thursday, the president expressed support for the firefighters, saying he was “concerned” Boeing had locked them out over the weekend.

Marysville
Marysville high school office manager charged with sex abuse of student

Carmen Phillips, 37, sent explicit messages to a teen at Heritage High School, then took him to a park, according to new charges.

Bothell
1 dead after fatal motorcycle crash on Highway 527

Ronald Lozada was riding south when he crashed into a car turning onto the highway north of Bothell. He later died.

Riaz Khan finally won office in 2019 on his fifth try. Now he’s running for state Legislature. (Kevin Clark / The Herald)
Ex-Democratic leader from Mukilteo switches parties for state House run

Riaz Khan resigned from the 21st Legislative District Democrats and registered to run as a Republican, challenging Rep. Strom Peterson.

Tlingit Artist Fred Fulmer points to some of the texture work he did on his information totem pole on Wednesday, May 8, 2024, at his home in Everett, Washington. (Ryan Berry / The Herald)
11-foot totem pole, carved in Everett, took 35 years to make — or 650

The pole crafted by Fred Fulmer is bound for Alaska, in what will be a bittersweet sendoff Saturday in his backyard.

Shirley Sutton
Sutton resigns from Lynnwood council, ‘effective immediately’

Part of Sutton’s reason was her “overwhelming desire” to return home to the Yakima Valley.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.