The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county this year. (Ryan Berry / The Herald)

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county this year. (Ryan Berry / The Herald)

Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

EVERETT — At least 10 of Snohomish County’s 210 bridges are set to be rebuilt or rehabilitated in the coming years, according to an annual report county engineers released May 22.

Construction for three bridges is set to begin this year, the report read. Those projects include replacing the Jordan Creek Bridge between Granite Falls and Arlington, replacing the Swamp Creek Bridge carrying Locust Way between Bothell and Brier, and doing maintenance work on Red Bridge 537 on the Mountain Loop Highway east of Granite Falls.

Other upcoming bridge construction projects listed in the report include:

• Seismic improvements to the bridge carrying Avenue D over the Snohomish River in Snohomish. Construction is planned for 2027.

• Replacing a culvert along the Mountain Loop Highway southeast of Darrington with a new bridge to restore fish passage along Goodman Creek. Construction is expected to begin in 2026.

• Seismic improvements to a bridge carrying Larson Road over the south Slough of the Stillaguamish River in Silvana. Construction is planned for 2028.

• Replacing the Granite Falls Bridge, a narrow 91-year-old bridge north of Granite Falls. County staff have been working on replacing the bridge for more than a decade, documents show. Construction on the $28.7 million project is set to begin in 2028.

• Repairs to two bridges on the Mountain Loop Highway between Granite Falls and Darrington. Construction is planned for 2026.

• Replacing the Pilchuck Creek Bridge northeast of Arlington. Construction is planned for 2028.

In its report, the county also flagged six more bridges, some designated as being in “poor condition” under nationwide inspection standards, as potential candidates for future replacement or rehabilitation. The county also flagged five short-span bridges, not eligible for federal grant funding, as potential candidates for replacement or repair.

Every bridge in Snohomish County is inspected at least every two years. The vast majority are listed as being in either “good” or “fair” condition under the Federal Highway Administration’s National Bridge Inspection Standards.

Eight of the county’s bridges currently have a “poor” rating, a county press release read. But three of those are already funded for replacement, two more are eligible for federal replacement funding and the other three are being explored as maintenance projects, the release said.

“Thanks to our dedicated and experienced teams, we continue to successfully manage bridges throughout their entire life cycle,” Snohomish County Bridge Engineer Tim Tipton wrote in the release. “Our strategy is to repair when we can and replace when needed and funding allows. All county-maintained vehicular bridges are open and safe for travel.”

Will Geschke: 425-339-3443; william.geschke@heraldnet.com; X: @willgeschke.

Clarification: This article has been updated to clarify the county’s bridge report was released on May 22.

Talk to us

> Give us your news tips.

> Send us a letter to the editor.

> More Herald contact information.

More in Local News

Jennifer Humelo, right, hugs Art Cass outside of Full Life Care Snohomish County on Wednesday, May 28, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
‘I’ll lose everything’: Snohomish County’s only adult day health center to close

Full Life Care in Everett, which supports adults with disabilities, will shut its doors July 19 due to state funding challenges.

(City of Everett)
Everett’s possible new stadium has a possible price tag

City staff said a stadium could be built for $82 million, lower than previous estimates. Bonds and private investment would pay for most of it.

The Edmonds City Council gathers to discuss annexing into South County Fire on Tuesday, Dec. 3, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Community group presents vision for Edmonds’ fiscal future

Members from Keep Edmonds Vibrant suggested the council focus on revenue generation and a levy lid lift to address its budget crisis.

The age of bridge 503 that spans Swamp Creek can be seen in its timber supports and metal pipes on Wednesday, May 15, 2024, in Lynnwood, Washington. The bridge is set to be replaced by the county in 2025. (Ryan Berry / The Herald)
Snohomish County report: 10 bridges set for repairs, replacement

An annual report the county released May 22 details the condition of local bridges and future maintenance they may require.

People listen as the Marysville School Board votes to close an elementary and a middle school in the 2025-26 school year while reconfiguring the district’s elementary schools to a K-6 model on Wednesday, Jan. 22, 2025 in Marysville, Washington. (Olivia Vanni / The Herald)
Marysville schools audit shows some improvement

Even though the district still faces serious financial problems, the findings are a positive change over last year, auditors said.

Outside of the Madrona School on Monday, Aug. 26, 2024 in Edmonds, Washington. (Olivia Vanni / The Herald)
Sewer district notifies Edmonds schools of intent to sue

The letter of intent alleges the school district has failed to address long-standing “water pollution issues” at Madrona K-8 School.

Cars drive along Cathcart Way next to the site of the proposed Eastview Village development that borders Little Cedars Elementary on Wednesday, May 7, 2025 in unincorporated Snohomish, Washington. (Olivia Vanni / The Herald)
Former engineer: Snohomish County rushed plans for Eastview development

David Irwin cited red flags from the developers. After he resigned, the county approved the development that’s now stalled with an appeal

Edie Carroll trims plants at Baker's Acres Nursery during Sorticulture on Friday, June 6, 2025 in Everett, Washington. (Olivia Vanni / The Herald)
Sorticulture, Everett’s garden festival, is in full swing

The festival will go through Sunday evening and has over 120 local and regional vendors.

Students attending Camp Killoqua next week pose with Olivia Park Elementary staff on Friday, June 6 near Everett. Top, from left: Stacy Goody, Cecilia Stewart and Lynne Peters. Bottom, from left: Shaker Alfaly, Jenna Alfaly and Diana Peralta. (Will Geschke / The Herald)
A school needed chaperones for an outdoor camp. Everett cops stepped up.

An Olivia Park Elementary trip to Camp Killoqua would have been canceled if not for four police officers who will help chaperone.

Cascadia College Earth and Environmental Sciences Professor Midori Sakura looks in the surrounding trees for wildlife at the North Creek Wetlands on Wednesday, June 4, 2025 in Bothell, Washington. (Olivia Vanni / The Herald)
Cascadia College ecology students teach about the importance of wetlands

To wrap up the term, students took family and friends on a guided tour of the North Creek wetlands.

Everett’s minimum wage goes up on July 1. Here’s what to know.

Voters approved the increase as part of a ballot measure in the November election.

Logo for news use featuring Snohomish County, Washington. 220118
State declares drought emergency for parts of Snohomish County

Everett and the southwest part of the county are still under a drought advisory, but city Public Works say water outlooks are good.

Support local journalism

If you value local news, make a gift now to support the trusted journalism you get in The Daily Herald. Donations processed in this system are not tax deductible.